For heavy industry, there are many major mechanical equipment used and the installation of major mechanical equipment is very important. Therefore, we need to make relevant preparations before installation. The following Chinese Standard Parts Network provides relevant installation preparations for the better and safer use of major mechanical equipment.
1. Technical preparation.
2. Organize preparation.
3. Supply preparation.
(1) Before construction, machines, tools and materials required in the technical preparation must be prepared and the installed mechanical equipment must be transported to the site for unpacking inspection, disassembly, cleaning and lubrication.
(2) Unpacking inspection of equipment.
(3) Equipment disassembly, cleaning and lubrication.
① Equipment cleaning. After unpacking inspection and disassembly, the equipment shall be assembled only after the rust inhibitor, iron filings, rust and dust accumulated during transportation and storage are cleaned.
Common cleaning agents in installation engineering include alkaline cleaning agent, cleaning agent containing non-ionic surfactant, petroleum solvent, and solvent for cleaning vapor phase anti-corrosion.
The rust proof layer on the processing surface of the cast iron platform equipment shall not be removed with abrasive cloth or metal scraper. Only clean cotton yarn, cotton cloth, wood scraper or horn scraper can be used. The dry oil can be cleaned with kerosene. Anti rust paint can be cleaned with banana water, alcohol, turpentine and acetone. If the rust on the machined surface cannot be wiped off with oil, it can be wiped off with a cotton cloth dipped in acetic acid; After rust removal, wipe with lime water and finally dry with clean cotton yarn or cloth. If the rust proof dry oil coated on the gears in the gearbox is too thick, 70~80 ℃ hot oil or 30~40 ℃ hot kerosene can be poured into the gearbox for cleaning. The hardened or difficult to clean ball bearings can be washed with 70~80 ℃ hot engine oil, then cleaned with kerosene, and finally cleaned with gasoline. Do not use cotton yarn when cleaning bearings. Only use clean cotton cloth; If it is inconvenient to clean the cotton cloth, use an oil gun to inject kerosene or hot engine oil for cleaning.
② Equipment lubrication. The internal and external parts of the equipment can be lubricated only after they are cleaned. The lubricating oil can only be used after being tested and confirmed to meet the requirements. Before adding the equipment, the lubricating oil must be filtered and the oil added shall reach the specified oil level; All lubricating parts and oil holes shall be filled with lubricating oil.
The use of grease seal is simple, not easy to get dirty and reduce losses. It is not necessary to change the grease frequently. In particular, it is of great practical significance for lubrication of high-speed motors, automatic devices and equipment that is not easy to oil. At the same time, the temperature has little effect on the change of load property and movement speed, and the grease has a large scope of adaptation. It is not easy to lose on the vertical lubrication surface. Adding proper amount of graphite powder into the lubricating grease can form a more tough oil film, which can slow down the reciprocating mechanism to avoid creeping and eliminate vibration. The lubricating grease cannot be used as circulating lubricant because of its poor fluidity and low thermal conductivity.
Popular products
Recommended News
Features of Multi station Cold Heading Machine and Precautions in Use2022-10-31
After laser disk or bar tapping, the multi station cold heading machine automatically assembles various hexagon nuts, namely light standard hexagon nu…
Processing technology, mechanism and working principle of automatic cold heading machine2022-10-31
The automatic cold heading machine is a special equipment mainly used for the mass production of nuts, bolts and other fasteners. The earliest cold he…
How to debug multi station cold heading machine?2022-10-21
How to debug multi station cold heading machine? And precautions for operating the multi station cold heading machine. 1. Press and hold the emergency…
Introduction to Cold Heading Machine Learning2022-10-21
Introduction to cold heading machine. 1. Check that the knife plate, cutting knife bar, punch, die, etc. should be intact without cracks, installed co…
All product pictures and publicity pictures of this website belong to us. No individual or organization is allowed to use them, and any embezzlement must be prosecuted.
Tel:0577-86266681Tel:0577-86125986mobile phone:13806699071E-mail:tianweimachine@126.comAdd: Haixi Industrial Park, Pingyang County, Wenzhou, Zhejiang
Service hotline
13806699071
We warmly welcome your consultation, and we will provide you with satisfactory mechanical solutions